No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. ASIA JULI PRADANA - 21.102.483.1-016.000 | 80,04 | Rp. 100.001.000,00 |
Rp. 100.001.000,00 |
||||||||
2 | PT. TRIKON MITRA ABADI - 66.057.525.9-542.000 | |
|
|||||||||
3 | PT. BAHANA NUSANTARA - 02.290.591.3-013.000 | 68,27 | Rp. 102.278.000,00 |
Rp. 102.278.000,00 |
Nilai Teknis Kurang Dari Passing Grade | |||||||
4 | PT. RekaCipta Kreasindo - 31.661.473.4-412.000 | 63,07 | Rp. 107.186.000,00 |
Rp. 107.186.000,00 |
Nilai Teknis Kurang Dari Passing Grade | |||||||
5 | PT. MITRA MADANI MULTICONSULT - 01.937.552.6-005.000 | 57,16 | Rp. 106.942.000,00 |
Rp. 106.942.000,00 |
Nilai Teknis Kurang Dari Passing Grade | |||||||
6 | CV. Mora Bintang Elektrindo - 72.676.577.9-008.000 | |
|
|||||||||
7 | CAKRA GATRA UTAMA. PT - 01.639.469.4-801.000 | |
|
|||||||||
8 | PT.PARINDO RAYA ENGINEERING - 31.184.181.1-419.000 | |
|
|||||||||
9 | PT. PARADHIGUNA DWIPANTARA LOKA - 72.003.128.5-822.000 | |
|
|||||||||
10 | CV.SITOR BOGOR - 73.958.552.9-403.000 | |
|
|||||||||
11 | kawan joymor - 31.567.399.6-407.000 | |
|
|||||||||
12 | CV MAJU TERUS - 81.277.592.2-436.000 | |
|
|||||||||
13 | PT. PAWACIPTA CONSULINDO - 02.024.148.5-419.000 | |
|
|||||||||
14 | PT. LINGGA LAYUNG MEGA MAKMUR - 02.250.002.9-419.000 | |
|
|||||||||
15 | MITRA DESIGN ENGINEERING - 02.121.777.3-419.000 | |
|
|||||||||
16 | PT. LOGARITMA PRIMA UTAMA - 02.510.690.7-432.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak